 +=== Oct 1st 2012 ===
  
 +Setup, pedestals, intercalibration
 +
 +| Run  | time | run conditions | comments |
 +| 1 | Sep 28th | pedestals| |
 +| 11 | 11:20 | torch| test camera 4 -- camera 2,3 not resp.|
 +| 12 | 11:35 | torch| test camera 2,3 -- camera 2,3 not resp.|
 +
 +
 +Tuning of Gains (assuming factor 3 at SW level to account for multiple fibers in 0,1,2):
 +| Camera | Gain |
 +| 0 | 600 |
 +| 1 | 690 |
 +
 +=== Oct 5th 2012 ===
 +| Run  | time | run conditions | comments |
 +| 15 | 14:30 | pedestals| |
 +| 21 | 14:45 | Laser tests|
 +| 22 | 16:50 | Laser tests|
 +| 27 | 19:10 | peds with only three cameras|
 +| 28 | 19:10 | signal with only three cameras -- shutter on|
 +
 +=== Oct 9th 2012 ===
 +
 +Spectrometer chamber mounted under vacuum and lanex interposed for electron diagnostics
 +
 +| Run  | time | run conditions | comments |
 +| 36 | 16:00 | pedestals| |
 +| 40 | 16:20 | ped with gain 1024, shutter 200| |
 +| 41 | 17:00 | spari! B==0| |
 +| 42 | 18:00 | scan gas jet  B==0| |
 +| 43 | 18:00 | scan gas jet  B==0.45T (I=91A)| |
 +| 45 | 19:00 | piedistallo con shutter 1 | |
 +| 46 | 19:15 | B==0 shutter 1 | |
 +| 45 | 19:00 | piedistallo con shutter 1 e gain 800| |
 +| 48 | 20:40 | test (evt 160 buono) |
 +| 51 | 20:45 | torniamo a gain 1023 |
 +| 52 | 20:54 | I=33A (B~0.15T) tanto: evt12, 14, 137,162,201|
 +
 +=== Oct 11th 2012 ===
 +1) scan pedestals as a function of gain and shutter. Time base set to 20mus
 +
 +2) align magnet with flange
 +
 +3) correlate  time stamps : spectr=19:10:30 --> monitoring=18:10:20
 +
 +4) estimate rough calibration constants @ gain =900, shutter= 4 (x20mus) {1,1.4,0.7,1.3,0.5}
 +
 +With B=0 nice collimated beam! 
 +{{:strutture:lnf:da:plasmonx:lpa:spectrometer:v1commissioning:primofascio.gif|}}
 +
 +TODO: 
 +  A) redo ROI for camera 1,2
 +  B) GUI:
 +      - debug spectrum plot
 +      - add possibility to subtract flat component 
 +      - correct for dead fibers
 +      - rebin (4 or 8)
 +  C) estimate effect of lanex by removing it
 +  D) screen spectrometer from direct laser
 +  E) intercalibrate cameras offline (with electroluminescence)
 +  F) integrate instructions for the camera readout into the manual
 +
 +| Run  | time | run conditions | comments |
 +|72 | 14:00 | pedestals gain 1000 shut 4 (x20mus) | cam03 non in DAQ; RMS~{4,1.5,1.5,-,3.5|
 +|73 | 14:00 | pedestals gain 950 shut 4 (x20mus) | cam03 non in DAQ; RMS~{4,1.5,1.5,-,3.5|
 +|74 | 14:00 | pedestals gain 900 shut 4 (x20mus) | cam03 non in DAQ; RMS~{3,1,1,-,2.5|
 +|75 | 14:00 | pedestals gain 850 shut 4 (x20mus) | cam03 non in DAQ; RMS~{2.4,1,1,-,2|
 +|78 | 16:00 | pedestals gain 900 shut 6 (x20mus) |  RMS~{3.5,1.5,1.5,6,2.5}|
 +|83 | 17:45 | pedestals gain 900 shut 10 (x20mus) |  RMS~{3,1.1,1.5,6,2.5}|
 +|84 | 17:50 | spari (belli) scan posizione gas-jet |Belli:29, 36 |  
 +|85 | 18:20 | pedestals gain 900 shut 4 (x20mus) |  RMS~{3,1.1,0.9,3,2.5}|
 +|87 | 18:40 | scan parabola with B=0 | |
 +|88 | 19:50 | scan parabola with I=33A (B~0.15T) | |
 +|92 | 00:00 | scan parabola in y I=33A| | 
 +|93 | 00:30 | scan parabola in x I=0| |
 +|94 | 00:00 | scan parabola in x I=33A| | 
 +|95 | 12:40 | fix everything and run at I=33A (0.15T)| |
 +|96 | 12:44 | fix everything and run at I=0| | 
 +|97 | 12:48 | fix everything and run at I=66A (0.3T)| |
 +|98 | 12:51 | fix everything and run at I=99A (0.45T)| |
 +
 +=== Oct 12th 2012 ===
 +
 +
 +New ROI file done  (files calib2012Oct12).
 +Run 101 pedestal run
 +Run 102 and run 103 (skip first 100/200 events) runs done moving a lamp over the fibres to check mapping and intercalibration  (0.8, 1.5, 1, 1.3, 1)
 +
 +TO DO: redo wrapping of fibres especially those corresponding to maroc 0 and 4!
 +
 +
 +=== Oct 18th 2012 ===
 + 
 +Shifted camera by 5mm 
 +
 +Rewrap fibers with thick aluminum
 +
 +| Run  | time | run conditions | comments |
 +| 110 | 12:30 | pedestals gain 900 shut 200 (x20mus) | after rewrapping RMS~{1,0.5,0.5,0.6,1.1}|
 +| 111 | 12:30 | (light on) pedestals gain 900 shut 4 (x20mus) | after rewrapping RMS~{1,0.5,0.5,0.6,1.1} -- no change|
 +| 112 | 12:30 | turn off light gain 900 shut 4 (x20mus) |  RMS~{1,0.5,0.5,0.6,1.1}|