Oct 1st 2012
Setup, pedestals, intercalibration
Run | time | run conditions | comments |
1 | Sep 28th | pedestals | |
11 | 11:20 | torch | test camera 4 – camera 2,3 not resp. |
12 | 11:35 | torch | test camera 2,3 – camera 2,3 not resp. |
Tuning of Gains (assuming factor 3 at SW level to account for multiple fibers in 0,1,2):
Camera | Gain |
0 | 600 |
1 | 690 |
Oct 5th 2012
Run | time | run conditions | comments |
15 | 14:30 | pedestals | |
21 | 14:45 | Laser tests | |
22 | 16:50 | Laser tests | |
27 | 19:10 | peds with only three cameras | |
28 | 19:10 | signal with only three cameras – shutter on |
Oct 9th 2012
Spectrometer chamber mounted under vacuum and lanex interposed for electron diagnostics
Run | time | run conditions | comments |
36 | 16:00 | pedestals | |
40 | 16:20 | ped with gain 1024, shutter 200 | |
41 | 17:00 | spari! B==0 | |
42 | 18:00 | scan gas jet B==0 | |
43 | 18:00 | scan gas jet B==0.45T (I=91A) | |
45 | 19:00 | piedistallo con shutter 1 | |
46 | 19:15 | B==0 shutter 1 | |
45 | 19:00 | piedistallo con shutter 1 e gain 800 | |
48 | 20:40 | test (evt 160 buono) | |
51 | 20:45 | torniamo a gain 1023 | |
52 | 20:54 | I=33A (B~0.15T) tanto: evt12, 14, 137,162,201 |
Oct 11th 2012
1) scan pedestals as a function of gain and shutter. Time base set to 20mus
2) align magnet with flange
3) correlate time stamps : spectr=19:10:30 –> monitoring=18:10:20
4) estimate rough calibration constants @ gain =900, shutter= 4 (x20mus) {1,1.4,0.7,1.3,0.5}
With B=0 nice collimated beam!
TODO:
A) redo ROI for camera 1,2 B) GUI: - debug spectrum plot - add possibility to subtract flat component - correct for dead fibers - rebin (4 or 8) C) estimate effect of lanex by removing it D) screen spectrometer from direct laser E) intercalibrate cameras offline (with electroluminescence) F) integrate instructions for the camera readout into the manual
Run | time | run conditions | comments |
72 | 14:00 | pedestals gain 1000 shut 4 (x20mus) | cam03 non in DAQ; RMS~{4,1.5,1.5,-,3.5 |
73 | 14:00 | pedestals gain 950 shut 4 (x20mus) | cam03 non in DAQ; RMS~{4,1.5,1.5,-,3.5 |
74 | 14:00 | pedestals gain 900 shut 4 (x20mus) | cam03 non in DAQ; RMS~{3,1,1,-,2.5 |
75 | 14:00 | pedestals gain 850 shut 4 (x20mus) | cam03 non in DAQ; RMS~{2.4,1,1,-,2 |
78 | 16:00 | pedestals gain 900 shut 6 (x20mus) | RMS~{3.5,1.5,1.5,6,2.5} |
83 | 17:45 | pedestals gain 900 shut 10 (x20mus) | RMS~{3,1.1,1.5,6,2.5} |
84 | 17:50 | spari (belli) scan posizione gas-jet | Belli:29, 36 |
85 | 18:20 | pedestals gain 900 shut 4 (x20mus) | RMS~{3,1.1,0.9,3,2.5} |
87 | 18:40 | scan parabola with B=0 | |
88 | 19:50 | scan parabola with I=33A (B~0.15T) | |
92 | 00:00 | scan parabola in y I=33A | |
93 | 00:30 | scan parabola in x I=0 | |
94 | 00:00 | scan parabola in x I=33A | |
95 | 12:40 | fix everything and run at I=33A (0.15T) | |
96 | 12:44 | fix everything and run at I=0 | |
97 | 12:48 | fix everything and run at I=66A (0.3T) | |
98 | 12:51 | fix everything and run at I=99A (0.45T) |
Oct 12th 2012
New ROI file done (files calib2012Oct12). Run 101 pedestal run Run 102 and run 103 (skip first 100/200 events) runs done moving a lamp over the fibres to check mapping and intercalibration (0.8, 1.5, 1, 1.3, 1)
TO DO: redo wrapping of fibres especially those corresponding to maroc 0 and 4!
Oct 18th 2012
Shifted camera by 5mm
Rewrap fibers with thick aluminum
Run | time | run conditions | comments |
110 | 12:30 | pedestals gain 900 shut 200 (x20mus) | after rewrapping RMS~{1,0.5,0.5,0.6,1.1} |
111 | 12:30 | (light on) pedestals gain 900 shut 4 (x20mus) | after rewrapping RMS~{1,0.5,0.5,0.6,1.1} – no change |
112 | 12:30 | turn off light gain 900 shut 4 (x20mus) | RMS~{1,0.5,0.5,0.6,1.1} |