strutture:lnf:dr:tps:tbcatania10:logbook:home
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
strutture:lnf:dr:tps:tbcatania10:logbook:home [2010/07/06 11:22] – alessio.sarti@lnf.infn.it | strutture:lnf:dr:tps:tbcatania10:logbook:home [2010/07/09 14:38] (current) – alessandro.paoloni@lnf.infn.it | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== Logbook ====== | ||
+ | |||
+ | |||
+ | ===== Summary ===== | ||
+ | |||
+ | |||
+ | ^ Run ^ Mixture ^ Configuration ^ HV Old chmb ^ HV New chmb ^ SC ^ BD ^ NaI ^ N evts ^ rate ^ comments ^ | ||
+ | | run_4jul2010_5 | 80/20 | conf_040710_acq5 | 2.0 kV | 2.0 kV| - | yes | yes | 400 | 0.1 Hz | Wrong Config file (TDC channels for QDC matching) | | ||
+ | | run_4jul2010_6 | 80/20 | conf_040710_acq6 | 2.0 kV | 2.0 kV| - | yes | yes | 4000 | 0.1 Hz | Fixed config file. Pedestal were wrong due to wrong LV | | ||
+ | | run_4jul2010_7 | 80/20 | conf_040710_acq6 | 2.0 kV | 2.0 kV| - | yes | yes | 400 | 0.1 Hz |LV is ok now. | | ||
+ | | run_5jul2010_1 | 80/20 | conf_050710_acq1 | 2.0 kV | 2.3 kV| - | yes | yes | 4000 | 0.003 Hz |3x3 added. | ||
+ | |||
+ | |||
+ | |||
+ | ===== Day 1 Configuration For cosmics acquisition ===== | ||
+ | |||
+ | ==== Hardware ==== | ||
+ | |||
+ | === Old Chamber === | ||
+ | |||
+ | - Discriminators: | ||
+ | |||
+ | === New Chamber === | ||
+ | |||
+ | - Discriminators: | ||
+ | |||
+ | === Beam Dump === | ||
+ | |||
+ | - Discriminators: | ||
+ | |||
+ | === Start Counter === | ||
+ | |||
+ | - Discriminators: | ||
+ | |||
+ | === NaI === | ||
+ | |||
+ | ==== TDC channels ==== | ||
+ | |||
+ | - Channels from 0 - 31 are from NIM/ECL AND from Blue camac disc | ||
+ | - Channels from 32 - 63 are from Black Camac disc | ||
+ | |||
+ | ==== Software / Mapping ==== | ||
+ | |||
+ | **Configuration being saved in conf_040710_cm1.txt** | ||
+ | |||
+ | **Trigger time in CH 0 of the NIM ECL translator** | ||
+ | |||
+ | === New Chamber Mapping === | ||
+ | |||
+ | * TDC: RED cables from 1 - 24 | ||
+ | - Cables 1 - 3 : splitted to acquire Both Time AND Charge. Go to Nim - Ecl translator Ch 10 - 11 - 12. [Guess **TDC 9,10,11**] | ||
+ | - Cables 4 - 21 : Camac discriminators .. last 2 chs of 1° black disc + ALL 2° black disc | ||
+ | - Cables 22 - 24 : NIM discriminator .. (2° NIM !io discriminator). Go to Nim - Ecl translator Ch 13 - 14 - 15. [Guess **TDC 12,13,14**] | ||
+ | * QDC: red cables from 1 - 3 | ||
+ | - Cables 1 - 3 : From io Nim disc to Channels 8 - 10 QDC. Delay of 200 ns | ||
+ | |||
+ | === Old Chamber Mapping === | ||
+ | |||
+ | * TDC: black cables from 0 - 31 | ||
+ | - Cables 0 - 3 : splitted to acquire Both Time AND Charge. Go to Nim - Ecl translator Ch 6 - 7 - 8 - 9. [Guess **TDC 5,6,7,8**] | ||
+ | - Cables 4 - 31 : Camac discriminators .. All blue camac discr [4-18] + first 14 channels of 1° camac black disc [19-31]. | ||
+ | * QDC: black cables from 0 - 3 | ||
+ | - Cables 0 - 3 : From io Nim disc to Channels 4 - 7 QDC. Delay of 200 ns | ||
+ | |||
+ | === Beam Dump Mapping === | ||
+ | |||
+ | * TDC: black cables from 32 - 33. Nim io discriminator. Go to Nim - Ecl translator Ch 2 - 3. [Guess **TDC 1,2**] | ||
+ | * QDC: black cables from 32 - 33 | ||
+ | - Cables 32 - 33 : From linear Fan IO to Channels 0 - 1 QDC. Delay of 100 ns | ||
+ | |||
+ | === Start Counter Mapping === | ||
+ | |||
+ | * TDC: black cables from 34 - 35. Nim io discriminator. Go to Nim - Ecl translator Ch 4 - 5. [Guess **TDC 3,4**] | ||
+ | * QDC: black cables from 34 - 35 | ||
+ | - Cables 34 - 35 : From linear Fan IO to Channels 2 - 3 QDC. Delay of 100 ns | ||
+ | |||
+ | === NaI Mapping === | ||
+ | |||
+ | * TDC: red cables from 25 - 26. Nim discriminator. **NOT BEING ACQUIRED**. | ||
+ | * QDC: red cables from 25 - 26. Nim discriminator. **NOT BEING ACQUIRED**. | ||
+ | |||
+ | ===== Run_4jul2010_5.out ===== | ||
+ | |||
+ | After proper shaping of NaI signals we see also times in the Beam Dump. | ||
+ | Brought HV of Old Chamber to 2.0 kV. | ||
+ | ** Now NaI is acquired and Start Counter is not ** | ||
+ | |||
+ | ===== Dead Channels ===== | ||
+ | |||
+ | - **OLD CHmb cable 14** 11 blue discriminator | ||
+ | - **New Chmb cable 13** 8 second black discriminator | ||
+ | |||
+ | ===== 5 July Night First start ===== | ||
+ | |||
+ | * HV old : 2.2, HV new 2.3; BD HV 1.65 kV; BD is not attenuated. First Beam studies started at ~20:00 | ||
+ | * Collimator is not used (just the 3cm before the SC). Picture is obtained... PMMA has been removed by Francesco. | ||
+ | |||
+ | * First run:: data/ | ||
+ | * Second run:: data/ | ||
+ | |||
+ | * Third run:: data/ | ||
+ | * QDC seems broken (20:43). several run beam3 --> beam6 done as study. | ||
+ | * Delayed CH 32 about 5 ns to remove time jitter of BD. | ||
+ | **Both QDC and SC are not working.... Struggling to see something** | ||
+ | * Recovered QDC: was going in busy state: needed few read cycles to exit from busy. 23:30 **We start to see something again** | ||
+ | * **First Beam Dump reasonable peak**: data/ | ||
+ | * Start counter is a ~ complete failure: NO signal on QDC [noise ~ + baseline subtracting charge from pedestal]. Time resolution ~3 ns. | ||
+ | * 00:53 decided to go for a scan of HV of the DCH. | ||
+ | - First points 1.6 kV. Chamber is attenuated. **Beam dump is not anymore attenuated** run_6jul10_beam1 . Attenuated @ 0.5 all the wire chambers to the QDC | ||
+ | |||
+ | |||
+ | ^ Run ^ Mixture ^ Configuration ^ HV Old chmb ^ HV New chmb ^ SC ^ BD ^ NaI ^ N evts ^ rate ^ comments ^ | ||
+ | | run_6jul10_beam1 | 80/20 | conf_050710_beam2 | 1.6 kV | 1.6 kV| yes | yes | - | 10k | ~150 Hz | OK. | | ||
+ | | run_6jul10_beam2 | 80/20 | conf_050710_beam2 | 1.7 kV | 1.7 kV| yes | yes | - | 30k | ~150 Hz | OK. | | ||
+ | | run_6jul10_beam3 | 80/20 | conf_050710_beam2 | 1.8 kV | 1.8 kV| yes | yes | - | 30k | ~150 Hz | OK. | | ||
+ | | run_6jul10_beam4 | 80/20 | conf_050710_beam2 | 1.9 kV | 1.9 kV| yes | yes | - | 30k | ~150 Hz | OK. | | ||
+ | | run_6jul10_beam5 | 80/20 | conf_050710_beam2 | 2.0 kV | 2.0 kV| yes | yes | - | 30k | ~150 Hz | OK. | | ||
+ | | run_6jul10_beam6 | 80/20 | conf_050710_beam2 | 2.1 kV | 2.1 kV| yes | yes | - | 30k | ~150 Hz | OK. | | ||
+ | | run_6jul10_beam7 | 80/20 | conf_050710_beam2 | 2.2 kV | 2.2 kV| yes | yes | - | 30k | ~150 Hz | OK. | | ||
+ | | run_6jul10_beam8 | 80/20 | conf_050710_beam2 | 2.3 kV | 2.3 kV| yes | yes | - | 30k | ~150 Hz | OK. | | ||
+ | |||
+ | * **Preparing night acq.** Threshold Start Counter moved to 30 mV for night acquisition. HV of all the chambers is 2.2 kV. Mixture still 80/20. Attenuate the Beam Dump (only 1 channel). Removed all the attenuators from the NEW chamber signals [chs 8,9,10 of QDC]. | ||
+ | * **Acquired 1.5M events in ~ 3 hours.** run_6jul10_allnight with conf_050710_beam2 configuration. | ||
+ | |||
+ | ==== DISCLAIMER ==== | ||
+ | |||
+ | |||
+ | **There is a good chance that all the data below that are screwed, due to gas flow problems.** | ||
+ | |||
+ | |||
+ | ===== 6 July Morning Studies (bad gas) ===== | ||
+ | |||
+ | * Started the scans @ high L for the S-T relations measurements: | ||
+ | - data/ | ||
+ | - data/ | ||
+ | * 7:55 Raised the thresholds to 70 mV for all the Chambers channels. First scan point @ 2.1 kV | ||
+ | - data/ | ||
+ | - data/ | ||
+ | - data/ | ||
+ | * 10:00 Finished the Scan. Change the Start counter and go to get breakfast... 2.3 kV , 70mV **Now we have the collimator** | ||
+ | - data/ | ||
+ | * 11:20 Taking O(10)k events at low HV, High Th. 2.0 kV | ||
+ | - data/ | ||
+ | - data/ | ||
+ | - data/ | ||
+ | |||
+ | ===== 6 July Lunch Studies (bad gas) ===== | ||
+ | |||
+ | **Major change of configuration**. conf_060710_lunch | ||
+ | - Old start counter gets in. [connected in place of the channels 1-2 of New Chamber] | ||
+ | - 3x3 Scintillator gets in [connected in place of the channel 3 of New Chamber] | ||
+ | - **New Chamber chs 1-3 are TDC disconnected** | ||
+ | - Change of the delay of the New start counter. **From 250 we go to 200ns each.** | ||
+ | - Connected Red cables 2,3 to Old start counter. Disc IN/out Chs 7-8. | ||
+ | |||
+ | |||
+ | ===== 6 July Damn Gas Studies ===== | ||
+ | |||
+ | After the major change of configuration we restarted to take the night data in steps of 100k evts. | ||
+ | |||
+ | - First dataset with GAS OK: run_6jul10_Collim2.3_70mV_regas.txt 100k evts. Run with old+new Start Counter discriminator TH @ 20 mV. **One HV Ch (Ch0:: U view of old chamber) is @ 2.2 kV** | ||
+ | - Second dataset @ 2.2 kV run_6jul10_Collim2.2_70mV_regas.txt . Old+new Start Counter Discriminator Thresholds now are at 30 mV | ||
+ | - Second dataset @ 2.1 kV run_6jul10_Collim2.1_70mV_regas.txt . Old+new Start Counter Discriminator Thresholds now are at 15 mV | ||
+ | |||
+ | Note: | ||
+ | - New Start Counter QDC channels 2,11 | ||
+ | - Old Start Counter QDC channels 8,9 | ||
+ | |||
+ | ===== 6 July 3x3 Studies ===== | ||
+ | |||
+ | - New Chamber is Turned Off | ||
+ | - Triggering on Beam Dump: we see just the events that are not STOPPED by the 3x3. ~60 Hz. | ||
+ | - 6.5 k events taken in data/ | ||
+ | - Added 3x3 to the trigger: 10k events taken in data/ | ||
+ | - Damped the 3x3 signal by a factor of 4. run_6jul10_3x3DumperTrig_Attx4 | ||
+ | - Added a 3mm collimator to study the scotch: run_6jul10_3x3DumperTrig_Attx4_Coll3mm | ||
+ | |||
+ | ===== 6 July 90° measurement ===== | ||
+ | |||
+ | - High rate, triggering on the Beam Dump. [Forget about neutrals we do not have time] | ||
+ | - HV chmb old is 2.2 kV | ||
+ | - New Chmb has been un-cabled, powered off | ||
+ | - Thresholds @ 70 mV .... Config file to be worked out | ||
+ | - Meas 3: 3x3 delayed. |