Table of Contents

Logbook

Summary

Run Mixture Configuration HV Old chmb HV New chmb SC BD NaI N evts rate comments
run_4jul2010_5 80/20 conf_040710_acq5 2.0 kV 2.0 kV - yes yes 400 0.1 Hz Wrong Config file (TDC channels for QDC matching)
run_4jul2010_6 80/20 conf_040710_acq6 2.0 kV 2.0 kV - yes yes 4000 0.1 Hz Fixed config file. Pedestal were wrong due to wrong LV
run_4jul2010_7 80/20 conf_040710_acq6 2.0 kV 2.0 kV - yes yes 400 0.1 Hz LV is ok now.
run_5jul2010_1 80/20 conf_050710_acq1 2.0 kV 2.3 kV - yes yes 4000 0.003 Hz 3x3 added.

Day 1 Configuration For cosmics acquisition

Hardware

Old Chamber

  1. Discriminators: All at 15 mV

New Chamber

  1. Discriminators: All at 15 mV

Beam Dump

  1. Discriminators: 50 mV

Start Counter

  1. Discriminators: 40 mV

NaI

TDC channels

  1. Channels from 0 - 31 are from NIM/ECL AND from Blue camac disc
  2. Channels from 32 - 63 are from Black Camac disc

Software / Mapping

Configuration being saved in conf_040710_cm1.txt

Trigger time in CH 0 of the NIM ECL translator

New Chamber Mapping

Old Chamber Mapping

Beam Dump Mapping

Start Counter Mapping

NaI Mapping

Run_4jul2010_5.out

After proper shaping of NaI signals we see also times in the Beam Dump. Brought HV of Old Chamber to 2.0 kV. Now NaI is acquired and Start Counter is not

Dead Channels

  1. OLD CHmb cable 14 11 blue discriminator
  2. New Chmb cable 13 8 second black discriminator

5 July Night First start

Both QDC and SC are not working…. Struggling to see something

Run Mixture Configuration HV Old chmb HV New chmb SC BD NaI N evts rate comments
run_6jul10_beam1 80/20 conf_050710_beam2 1.6 kV 1.6 kV yes yes - 10k ~150 Hz OK.
run_6jul10_beam2 80/20 conf_050710_beam2 1.7 kV 1.7 kV yes yes - 30k ~150 Hz OK.
run_6jul10_beam3 80/20 conf_050710_beam2 1.8 kV 1.8 kV yes yes - 30k ~150 Hz OK.
run_6jul10_beam4 80/20 conf_050710_beam2 1.9 kV 1.9 kV yes yes - 30k ~150 Hz OK.
run_6jul10_beam5 80/20 conf_050710_beam2 2.0 kV 2.0 kV yes yes - 30k ~150 Hz OK.
run_6jul10_beam6 80/20 conf_050710_beam2 2.1 kV 2.1 kV yes yes - 30k ~150 Hz OK.
run_6jul10_beam7 80/20 conf_050710_beam2 2.2 kV 2.2 kV yes yes - 30k ~150 Hz OK.
run_6jul10_beam8 80/20 conf_050710_beam2 2.3 kV 2.3 kV yes yes - 30k ~150 Hz OK.

DISCLAIMER

There is a good chance that all the data below that are screwed, due to gas flow problems.

6 July Morning Studies (bad gas)

6 July Lunch Studies (bad gas)

Major change of configuration. conf_060710_lunch

  1. Old start counter gets in. [connected in place of the channels 1-2 of New Chamber]
  2. 3x3 Scintillator gets in [connected in place of the channel 3 of New Chamber]
  3. New Chamber chs 1-3 are TDC disconnected
  4. Change of the delay of the New start counter. From 250 we go to 200ns each.
  5. Connected Red cables 2,3 to Old start counter. Disc IN/out Chs 7-8.

6 July Damn Gas Studies

After the major change of configuration we restarted to take the night data in steps of 100k evts.

  1. First dataset with GAS OK: run_6jul10_Collim2.3_70mV_regas.txt 100k evts. Run with old+new Start Counter discriminator TH @ 20 mV. One HV Ch (Ch0:: U view of old chamber) is @ 2.2 kV
  2. Second dataset @ 2.2 kV run_6jul10_Collim2.2_70mV_regas.txt . Old+new Start Counter Discriminator Thresholds now are at 30 mV
  3. Second dataset @ 2.1 kV run_6jul10_Collim2.1_70mV_regas.txt . Old+new Start Counter Discriminator Thresholds now are at 15 mV

Note:

  1. New Start Counter QDC channels 2,11
  2. Old Start Counter QDC channels 8,9

6 July 3x3 Studies

  1. New Chamber is Turned Off
  2. Triggering on Beam Dump: we see just the events that are not STOPPED by the 3x3. ~60 Hz.
  3. 6.5 k events taken in data/run_6jul10_3x3Dumper.txt
  4. Added 3x3 to the trigger: 10k events taken in data/run_6jul10_3x3DumperTrig.txt Too much light
  5. Damped the 3x3 signal by a factor of 4. run_6jul10_3x3DumperTrig_Attx4
  6. Added a 3mm collimator to study the scotch: run_6jul10_3x3DumperTrig_Attx4_Coll3mm

6 July 90° measurement

  1. High rate, triggering on the Beam Dump. [Forget about neutrals we do not have time]
  2. HV chmb old is 2.2 kV
  3. New Chmb has been un-cabled, powered off
  4. Thresholds @ 70 mV …. Config file to be worked out
  5. Meas 3: 3x3 delayed.