Catania 10 TB

Going to acquire:

  1. Start counter (1 or 2): Scintillator
  2. Tracker: DCH
  3. Dump: Scintillator

Hot topic

  • Crate NIM: at least 2 given the number of modules [2 HV modules + 6-7 DISC modules]
  • Splitters?
  • Check crate VME
  • Check disc CAMAC
  • Check Cables @ Catania

Readout

TDC

  • From SC: 2 ch → NIM Linear Fan in/out → NIM Disc → NIM/ECL transl
  • From BD: 2 ch → NIM Linear Fan in/out → NIM Disc → NIM/ECL transl
  • From OLD dch:
    • 16 ch (1 view) → CAMAC Disc
    • 12 ch (3 planes) → CAMAC Disc
    • 4 ch (4th plane) → Disc [in/out] → NIM/ECL transl
  • From NEW dch:
    • 12 ch (1 view, 4 planes) → CAMAC Disc
    • 6 ch (2 planes) → CAMAC Disc
    • 3 ch (1 plane) → NIM Disc → NIM/ECL transl
    • 3 ch (4th plane) → Disc [in/out] → NIM/ECL transl
  1. Summary Modules
    • 3 CAMAC disc: 46 Ch (2 dead)
    • 1 HV (big) 4 ch (for scint)
    • 1 HV (small) 4 ch chmb
    • 1 8 ch disc in/out (chmb channels to TDC,ADC)
    • 1 4 ch fan in/out linear (scint ch to TDC, ADC)
    • 1 8 ch disc (50 Ohm in) for channels from scint
    • 1 16 ch NIM/ECL transl
    • 1 Coincidence
    • 1 Dual timer
    • 1 Gating/delay module
  2. Spare
    • 1 8ch disc (50 Ohm in)
    • crate NIM?
    • Scaler

Preliminary Schedule

  • Leaving Thursday night 1/07
  • Friday 2/07 → cabling + cosmics setup
  • Monday 5/07 → change from cosmics to beam

Timing Config

  • First dual timer
    • In from coincidence. Shaping 10-100 mus. Out to 2nd DT. Endmarker to strobe of IOREG.
  • Second dual timer
    • In From 1st DT. !out to Trigger. Shaping inf. Reset from IOREG.