strutture:lnf:dr:tps:tbcatania10:home
Table of Contents
Catania 10 TB
Going to acquire:
- Start counter (1 or 2): Scintillator
- Tracker: DCH
- Dump: Scintillator
Hot topic
- Crate NIM: at least 2 given the number of modules [2 HV modules + 6-7 DISC modules]
- Splitters?
- Check crate VME
- Check disc CAMAC
- Check Cables @ Catania
Readout
TDC
- From SC: 2 ch → NIM Linear Fan in/out → NIM Disc → NIM/ECL transl
- From BD: 2 ch → NIM Linear Fan in/out → NIM Disc → NIM/ECL transl
- From OLD dch:
- 16 ch (1 view) → CAMAC Disc
- 12 ch (3 planes) → CAMAC Disc
- 4 ch (4th plane) → Disc [in/out] → NIM/ECL transl
- From NEW dch:
- 12 ch (1 view, 4 planes) → CAMAC Disc
- 6 ch (2 planes) → CAMAC Disc
- 3 ch (1 plane) → NIM Disc → NIM/ECL transl
- 3 ch (4th plane) → Disc [in/out] → NIM/ECL transl
- Summary Modules
- 3 CAMAC disc: 46 Ch (2 dead)
- 1 HV (big) 4 ch (for scint)
- 1 HV (small) 4 ch chmb
- 1 8 ch disc in/out (chmb channels to TDC,ADC)
- 1 4 ch fan in/out linear (scint ch to TDC, ADC)
- 1 8 ch disc (50 Ohm in) for channels from scint
- 1 16 ch NIM/ECL transl
- 1 Coincidence
- 1 Dual timer
- 1 Gating/delay module
- Spare
- 1 8ch disc (50 Ohm in)
- crate NIM?
- Scaler
Preliminary Schedule
- Leaving Thursday night 1/07
- Friday 2/07 → cabling + cosmics setup
- Monday 5/07 → change from cosmics to beam
Timing Config
- First dual timer
- In from coincidence. Shaping 10-100 mus. Out to 2nd DT. Endmarker to strobe of IOREG.
- Second dual timer
- In From 1st DT. !out to Trigger. Shaping inf. Reset from IOREG.
strutture/lnf/dr/tps/tbcatania10/home.txt · Last modified: 2010/06/17 10:41 by alessio.sarti@lnf.infn.it